Skip to main content

Bondada Engineering Receives NTPC Renewable Award For 100 MWh Vanadium BESS At Khavda

Bondada Engineering has been awarded a turnkey EPC contract by NTPC Renewable Energy for a 100 MWh Vanadium Redox Flow BESS at Khavda Solar Park in Gujarat, expanding its presence in long-duration energy storage. This development follows a series of substantial renewable orders, including its ₹1,338.03 crore Sitapur solar-BESS project, and a stellar FY26 performance featuring ₹2,843 crore in consolidated revenue.

Author Image
Sahi Markets
Published: 20 Jul 2026, 12:20 PM IST (3 months ago)
Last Updated: 20 Jul 2026, 12:20 PM IST (3 months ago)
2 min read
Reviewed by Arpit Seth

Market snapshot: Bondada Engineering has received a Notification of Award from NTPC Renewable Energy for the turnkey EPC package of a 100 MWh Vanadium Redox Flow Battery Energy Storage System (BESS) at Khavda Solar Park in Gujarat. This crucial win marks a key milestone in Bondada's strategic expansion into the utility-scale energy storage market.

Data Snapshot

  • EPC package for 100 MWh Vanadium Redox Flow BESS at Khavda Solar Park in Gujarat.
  • FY26 consolidated revenue of ₹2,843 crore, showing 81% year-on-year growth.
  • Consolidated net profit of ₹211 crore reported for FY26.

What's Changed

  • Consolidated revenue increased by 81% YoY to ₹2,843 crore in FY26 compared to ₹1,571 crore in FY25.
  • The company has formally integrated advanced Vanadium technology into its BESS portfolio, backed by an upcoming 27-acre manufacturing plant in Hyderabad.

Key Takeaways

  • Advanced Tech Adoption: Transitioning to long-duration Vanadium Redox Flow technology positions Bondada at the forefront of grid-scale energy storage.
  • Marquee PSU Partnership: Securing a second direct order from the NTPC Group reflects strong institutional trust in Bondada's execution capabilities.
  • Strong Backlog Visibility: The contract further solidifies their multi-gigawatt renewable order book, supporting execution visibility through FY27.

SAHI Perspective

The award of the 100 MWh Vanadium BESS at Khavda marks a critical strategic step for Bondada Engineering. Unlike traditional Lithium-ion storage, Vanadium Redox Flow systems offer superior longevity and safety, aligned with India's long-duration grid stabilization demands. Backed by their upcoming integrated manufacturing plant in Hyderabad, Bondada is positioned to capture high-margin technology-driven storage contracts rather than relying solely on low-margin civil works.

Market Implications

As India targets 500 GW of renewable capacity by 2030, grid balancing via BESS is becoming non-negotiable. This order win confirms NTPC's commitment to deploying cutting-edge long-duration energy storage at its mega-parks, boosting market confidence in domestic EPC players that are tech-ready. This transition will likely spark similar tenders from other state power utilities.

Trading Signals

Market Bias: Bullish

Bondada's addition of a 100 MWh Vanadium BESS package directly enhances their fast-executing, high-margin portfolio. Coupled with an 81% YoY jump in FY26 revenue to ₹2,843 crore and strong order pipeline visibility, the near-term outlook remains highly favorable.

Overweight: Renewable Energy EPC, Battery Energy Storage Systems, Power Infrastructure

Trigger Factors:

  • Commissioning milestones for the 100 MWh Khavda BESS project.
  • Execution progress of the ₹1,338.03 crore Sitapur hybrid solar-BESS contract.
  • Groundbreaking and Capex outlays for the 27-acre Hyderabad manufacturing facility in Q2 FY27.

Time Horizon: Medium-term (3–12 months)

Industry Context

India's energy storage landscape is rapidly pivoting toward hybrid solar-BESS tenders and standalone grid-scale storage solutions to manage solar peak-curtailment. The government's push for round-the-clock power has created a robust runway for utility-scale batteries, with the domestic BESS market projected to expand dramatically. EPC developers with specialized execution capabilities and in-house component fabrication, such as Bondada, are capture-ready.

Key Risks to Watch

  • Supply chain dependence on imported core battery components from partners in China.
  • Execution and integration delays associated with deploying relatively new Vanadium Redox Flow technology at scale.

Recent Developments

In June 2026, Bondada secured a massive ₹1,338.03 crore hybrid solar-plus-storage contract from NTPC REL in Sitapur, Uttar Pradesh. Additionally, on July 18, 2026, the company secured a ₹10.44 crore BSNL telecom tower supply contract, demonstrating multi-sector execution agility.

Closing Insight

Bondada's Khavda BESS win signifies more than just an order addition; it underscores a deep technological leap into long-duration energy storage. By aligning its upcoming Hyderabad manufacturing facility with Vanadium technology, Bondada is positioning itself as a vertically integrated storage powerhouse, poised to yield high-margin long-term returns in India's clean energy transition.

High Performance Trading with SAHI.

Disclaimer: This news section may include AI-generated or AI-assisted news, summaries, drafts, or insights. All content is subject to human review before publication. While we aim for accuracy, readers should independently verify information before relying on it.

Open Free Account

Frequently Asked Questions (FAQs)

All topics

Add Sahi as a Preferred Source on Google

Click the link, confirm the box next to sahi.com is checked — ignore any other results.