Behari Lal Engineering IPO Allotment Status: Check GMP & Listing Date
Behari Lal Engineering IPO allotment is expected on August 17 after the issue received 118.07x subscription. Check GMP, allotment status, refund date and listing details.
Behari Lal Engineering IPO Allotment Status: Behari Lal Engineering IPO allotment is expected to be finalised on 17 Aug 2026. Investors can check their allotment status through the registrar, MUFG Intime India, as well as on BSE and NSE websites.
Behari Lal Engineering IPO Allotment Status: Behari Lal Engineering IPO allotment is expected to be finalised on 17 Aug 2026. The issue was subscribed 118.07 times overall.
With such demand, allotment chances in Behari Lal Engineering may be lower for many investors. Investors can check their allotment status on BSE, NSE, or MUFG Intime India.
Here's a look at the latest allotment details, Behari Lal Engineering subscription figures, GMP, and Behari Lal Engineering listing date.
Behari Lal Engineering IPO Allotment Date and Time
Here are Behari Lal Engineering allotment and listing dates:
-
Allotment Date: 17 Aug 2026
-
Refund Initiation: 18 Aug 2026
-
Demat Credit: 18 Aug 2026
-
Listing Date: 19 Aug 2026
-
Time: 10 AM, 19 Aug 2026
How to Check Behari Lal Engineering IPO Allotment Status
You can check Behari Lal Engineering IPO allotment status through multiple methods, such as:
Method 1: Procedure to Check Behari Lal Engineering IPO Allotment Status Online On NSE
-
First, go to the NSE IPO bid verification link: https://www.nseindia.com/invest/check-trades-bids-verify-ipo-bids
-
Now, select Equity & SME IPO bid details
-
Select BLEL
-
Enter your PAN number & application number.
-
And submit to check your allotment status.
Method 2: Procedure to Check Behari Lal Engineering IPO Allotment Status Online On BSE
-
Visit BSE IPO allotment link: https://www.bseindia.com/investors/appli_check
-
Now tick Equity under issue type.
-
Select Behari Lal Engineering from the dropdown.
-
Enter your application number OR PAN number.
-
And fill the captcha and click Search to view allotment.
Method 3: Procedure to check Behari Lal EngineeringIPO Allotment Status on MUFG Intime India through PAN Card (Registrar to the issue)
-
Go to MUFG Intime India Pvt.Ltd portal: https://in.mpms.mufg.com/Initial_Offer/public-issues.html
-
Choose Behari Lal Engineering IPO from the dropdown list.
-
Now select PAN, Application Number, or DP ID option.
-
Enter the details.
-
And click Submit to see Behari Lal Engineering allotment results.
Behari Lal EngineeringIPO DAY 3 Subscription Status
Behari Lal Engineering IPO saw good demand from investors, especially on Day 3. Here's a look at category-wise subscription figures:
|
Category |
Subscription (Times) |
|---|---|
|
QIB (Qualified Institutional Buyers) |
222.04 |
|
NII (Non-Institutional Investors) |
167.95 |
|
Retail Individual Investors |
54.12 |
|
Total |
118.07 |
Source: NSE, as of 14 Aug 2026, 7.28 PM
-
Behari Lal Engineering IPO saw a good rise in bids on the final day, with strong participation across investor categories. QIB led the demand by subscribing 222.04 times (by 7:25 PM), while retail investors also showed interest with a subscription of 54.12 times (as of 7.25 PM)
-
118.07x oversubscription means allotment may be difficult for many applicants, as demand was higher than the shares available.
Behari Lal Engineering IPO GMP Day-wise
Behari Lal Engineering IPO GMP is currently (17th Aug) ₹87 up, against the upper price band of ₹285, indicating 30.53% listing gain. Here are the GMP trends during the last 3 subscription days, based on various media reports and the Investor Gain website.
|
GMP Date |
IPO Price |
GMP (₹) |
Est. Listing Price |
Subscription |
|---|---|---|---|---|
|
14-Aug-2026 ( Day 3) |
₹285 |
₹83 |
₹368 (29.12%) |
118.07x |
|
13-Aug-2026 ( Day 2) |
₹285 |
₹80 |
₹365 (28.07%) |
8.47x |
|
12-Aug-2026 ( Day 1) |
₹285 |
₹74 |
₹359 (25.96%) |
2.21x |
Data source: Investor Gain
Although GMP is unofficial, highly volatile, and should not be treated as a guaranteed listing price.
GMP figures are for news purposes only. GMP data is sourced from various media houses. We neither trade in the grey market nor recommend trading based on GMP trends.
READ THIS ALSO: Shiprocket IPO Allotment Status
What’s Next After Behari Lal Engineering Allotment?
-
If shares are allotted, shares will reflect in your demat account on 18 Aug 2026.
-
If you don't receive an allotment, the blocked amount will be released on 18 Aug 2026.
-
Applicants receiving a partial allotment in Behari Lal Engineering will get the remaining amount unblocked.
-
After allotment, investors can track Behari Lal's listing-day demand and market sentiment for further cues.
Behari Lal Engineering IPO Listing Date and Time
Behari Lal Engineering shares will be listed on NSE and BSE on Wednesday, 19 Aug, at 10 am.
About Behari Lal Engineering
Behari Lal Engineering is an integrated iron and steel manufacturer providing customised engineering solutions. Its products include metal rolls, engineering castings, alloy steel products, forging ingots and forged shafts and blocks for industries such as steel, mining, power and sugar.
As of March 31, 2026, the company served 1,825 domestic and international customers, including Amba Shakti Industries, BMW Industries, Shyam Metallics and Energy, Laxcon Steels, MSP Steel & Power, Jai Balaji Industries, Propel Industries and Metso India.
The company operates two manufacturing units in Mandi Gobindgarh, Punjab. Its order book stood at ₹178.57 crore as of May 31, 2026.
Behari Lal Engineering IPO Financial Highlights
The company has reported consistent growth in PAT over the last three years, while maintaining a strong ROE of 23.78% and ROCE of 28.38% during the period.
|
Period Ended |
31 Mar 2026 |
31 Mar 2025 |
31 March 2024 |
|---|---|---|---|
|
Revenue from operations (₹ Cr) |
534.03 |
507.91 |
446.08 |
|
Total Income (₹ Cr) |
546.52 |
516.30 |
449.96 |
|
EBITDA (₹ Cr) |
101.33 |
81.31 |
60.99 |
|
EBITDA Margin (%) |
18.97 |
16.01 |
13.67 |
|
PAT (₹ Cr) |
64.64 |
52.95 |
35.79 |
|
PAT Margin (%) |
12.10 |
10.43 |
8.02 |
|
ROE (%) |
23.60 |
24.31 |
22.83 |
|
ROCE (%) |
27.11 |
28.24 |
21.98 |
|
Net Debt/Equity |
0.06 |
0.03 |
0.21 |
Source: Behari Lal Engineering RHP
All topics
Click the link, confirm the box next to sahi.com is checked — ignore any other results.